Category Archives: Case Studies / Example Projects

Fibreglass Hot Tub Refurbishment – Case Study

Not every DIY Hot Tub project that I work on is a new design and build. I do a lot of “rescue projects” where tubs and pool are either partly done or partly designed and the customer need help to finish things off. The other line of work that I do is refurbishments and help people get non-working tubs back in action. 

This project is more of a hybrid between a refurbishment and a new build than anything. Mark came to me wanting to remove his fibreglass hot tub that had seen better days and replace it with a poured concrete tub but keep most of the plumbing he already had.

I love it when a plan comes together

“I love it when a plan comes together”. Anyone spot the 1980s popular TV culture reference to the A-Team? Probably my favourite TV program as a child. Perhaps, dare I say it how I got into the whole “DIY thing”. I always marvelled at the inventions the A Team cobbled together. I loved making things as a kid. I still love making and creating “things” today. I remember vividly playing “A-Team” with my younger brother – I was always Hannibal Smith – the “man with a plan”.

Mel’s In Ground Hot tub Pavilion – Case Study

When Mel got in touch back in July of 2021, his goal was pretty straight forward. He had sent me a picture of a pavilion with an on ground hot tub that you can see below. This was the inspiration and this is what he was setting out to achieve. Oak framed pavilion with an in ground hot tub. Perfect.

My Hot Tub Control Room Remodel

the old control room

For those of you who are regular readers of the blog or indeed my YouTube Channel, you will know I talk an awful lot about the control room.

The control room is the hub of your hot tub and if you get this portion wrong, then you are going to be in trouble. Worst case, your hot tub just won’t work.